ClientEquilibrium
Value£390k
ContractJCT D&B
Duration12 weeks
LocationDisbury
CategoryRefurbishment
Cardon Construction was appointed on 3 phases of construction to different areas of the building at Eleanor Hospital, the basement, ground floor reception, and the external regions. The basement saw the removal of the existing kitchen, which was replaced with a new modern kitchen facility along with the introduction of a new store room.
The ground floor required part demolition, new M&E, joinery, doors, a new disabled toilet, tea station, decoration, and reconfiguring the reception areas.
Externally, Cardon introduced a new outdoor building, fencing extension, and new smoking shelters.